Padel Court Construction Process: How We built 2 Courts, step by step

With the help of this video, we would like to show you the installation process of 2 Padel Courts Mod. PREMIUM.
Indoor blue padel court by PadelCreations with branding and net divisions.

From bare ground to first match: watch how our team installed two Mod. PREMIUM padel courts – and see what happens at each stage.

From bare ground to first match: watch how our team installed two Mod. PREMIUM padel courts – and see what happens at each stage.

Watch the installation

In this video, we show the full installation process of 2 padel courts, Mod. PREMIUM – from the steel structure to the finished courts.

[vídeo]

How long does it take to build 2 padel courts?

The installation itself is quick: our team of 3 experienced installers needs around 3–5 days per court. The full project takes longer, because groundworks and the concrete base need time to cure before installation can start. Depending on the site, the overall timeline ranges from several weeks to a few months.

The padel court construction process, step by step

1. Site preparation

The site is cleared, levelled and checked for drainage. A geotechnical survey beforehand shows whether the ground can carry the courts.

2. Foundation and base

A perimeter ring beam carries the steel structure, and the playing area gets a base of porous concrete or porous asphalt so rainwater drains through. More on this in our guide to padel court foundations.

3. Steel structure

The steel posts and frames are assembled and anchored to the ring beam. This is where the Mod. PREMIUM gets its extra stability for exposed sites.

4. Glass panels and mesh

The tempered safety glass panels are fitted to the back and side walls, followed by the steel mesh panels that complete the enclosure.

5. Artificial turf

The turf is rolled out over the base, the seams are joined and the court lines are fitted. Finally, quartz sand is brushed in to give the surface its grip and ball bounce.

6. Net and lighting

The net is fitted at the centre of the court, and the LED floodlights are mounted on the structure and connected to the power supply.

7. Final check and handover

very court is checked for stability, glass fixings, surface and lighting before it’s handed over and ready for play.

Optional extras

Benches, scoreboards, ball-catch nets and branding can be added around the courts to improve the experience for players and spectators.

Planning your own padel courts?

See how your courts would look in our 3D planner – and request a no-obligation quote if you like.

For further questions do not hesitate to contact us.

On this page

Frequently asked questions

Is padel a threat to tennis?

No. For most clubs, the bigger risk is a padel centre opening nearby while they still only offer tennis.

How many padel courts fit on one tennis court?

Usually 2–3, depending on the space and run-off area available.

Do tennis players play padel too?

Yes. Many members play both – padel doesn't replace tennis, it just gives them another reason to stay at the club.

Can tennis coaches teach padel?

Yes. With a short additional qualification, tennis coaches can add padel to their coaching programme.